A radical approach to riverside heritage
The Watershed was a dilapidated single-storey listed warehouse beside the River Wye in Hereford. It flooded regularly, which made its future difficult, but also created the opportunity for a much more imaginative response.
RRA purchased the building in 2004 and designed its conversion to be a flexible space and our eventual Head Office when our lease came up. The conversion transformed this old and easily ignored stone shed into a striking, contemporary two-storey space that was practical, flexible and architecturally ambitious. The Watershed operated as an event space, art gallery and then a gym, before it became RRA’s Head Office until the building was sold in 2019 and we moved our Head Offices to Cheltenham.
Rather than try to keep the water out at all costs, RRA encouraged a more radical approach. This Hereford heritage conversion was designed to accept occasional flooding, with materials, services and detailing carefully chosen to withstand saturation and allow the ground floor to recover quickly after a flood event.
Designing for flood resilience
The existing sloped ground floor was maintained to allow flood water to drain out of the building to the river. Electrical and power services were brought down from above, helping reduce risk during flood events and allowing the upper floor to remain dry and separately serviced.
Many original materials were reused during the conversion, reducing waste and helping retain the character of the historic warehouse. The existing stone walls were expertly repaired using lime, with traditional construction methods and locally sourced materials chosen wherever possible.
A flexible and accessible event space
The conversion also created a fully accessible and compliant event space, with lift access, a shower room, bar area and mini kitchen. The design was deliberately flexible, allowing the building to adapt to a wide range of uses, from offices and gallery space to exhibitions, fitness, entertainment and community events.
This flexibility was important. The building needed to work as RRA’s own Head Office eventually, but also to have a long-term future beyond one specific use. By combining practical access, robust materials and adaptable spaces, the design gave the historic warehouse a much more viable future.
A glass box in the trees
Above the restored stone wall plate, a contemporary glazed first floor was added. This new upper level was designed as a glass box, giving the experience of walking within the canopy of the surrounding parkland trees.
From outside, the reflective quality of the glazing helps the additional storey sit lightly within its setting. This was particularly important because the building lies within views towards Hereford Cathedral. The design needed to create new space without dominating the riverside or interrupting the relationship between the warehouse, the trees, the river and the cathedral beyond.
The steel support structure was also shaped by the setting. Its branching, tree-like forms reflect the nearby parkland, while also creating a series of Gothic arch shapes that lead the eye towards Hereford Cathedral across the River Wye.
The Watershed won a Hereford Conservation Areas Award in 2007 and was shortlisted for the RIBA Awards in 2008. For RRA Architects, it remains a memorable example of how conservation, flood resilience and bold architectural thinking can work together to give a historic building a viable new future.
For more on the construction story behind The Watershed, including its transformation in photos from a flood-prone riverside warehouse into an award-winning glazed first-floor space, read our #40Projects40Weeks blog, “The Watershed, From Forgotten Warehouse to Riverside Landmark.“
Project highlights
- Hereford heritage conversion of a listed riverside warehouse
- Transformation from a single-storey stone warehouse into a two-storey space
- A flood resilient design strategy allowing the building to flood safely
- Sloped ground floor to help water drain after flood events
- Top-down electrical and power services
- Repair of historic stone walls using lime
- Reuse of original building materials
- A contemporary glazed first floor with low visual impact
- Tree-like steel supports framing views towards Hereford Cathedral
- Lift access, shower room, bar area and kitchen
- Flexible use as offices, gallery space, exhibitions, fitness, entertainment and events
- Winner of a Hereford Conservation Areas Award in 2007
- Shortlisted for the RIBA Awards in 2008