Week 33: Designing a Better Place to Work

Polaroid-style view of the landscaped courtyard and gabled offices near Ludlow, featured in Week 33 of RRA Architects’ anniversary series.

October 22, 2026 / By rachel

When the client began planning new offices near Ludlow, the ambition was to give staff a more comfortable place to work and more opportunity to spend time together. Their existing accommodation was spread through older agricultural buildings, where cold, damp conditions and separate rooms made the working environment far from ideal.

For Week 33 of our #40Projects40Weeks series, we are looking at how that ambition developed into a new headquarters, with workplace design focused on light, connection and the people using the building.

 

View through trees and shrubs towards the courtyard of Ludlow Commercial Headquarters, showing glazed walls, zinc roofs and timber shading.
Planting frames the courtyard and softens views of the offices, making the surrounding landscape part of the building’s everyday character.

 

Annotated 3D site diagram showing the proposed office site outlined in orange behind existing commercial buildings near Ludlow.
Finding the right location was an early step in RRA’s sustainable office design for Ludlow Commercial Headquarters, considering how a new building could relate to existing businesses, access routes and the surrounding landscape.

 

Starting with the right questions

The first idea was to convert a warehouse within the main complex. It was available, conveniently located and worth investigating before committing to a new building.

RRA’s feasibility study showed that its height restricted the potential layout, while the cost of adapting it and incorporating the client’s environmental ambitions would be substantial. A suitable location elsewhere on the site offered the opportunity to create offices around the brief, with the warehouse continuing to serve a useful purpose as storage.

That early assessment helped establish a clear direction for the project: a new workplace designed around how the team needed to work.

 

Illustrated ground-floor plan showing reception, a central staircase, offices, meeting rooms and breakout space in two wings around a landscaped courtyard.
The ground floor brings reception, offices, meeting rooms and breakout space together around a shared entrance foyer and sheltered courtyard.

 

Illustrated first-floor plan showing private and shared offices linked by a central landing, with stair voids, a tea point and a planted roof between the wings.
Private and shared offices connect through the central landing, with the stair voids and planted roof showing how the building opens between floors and wings.

 

Room to work together

Bringing people into one building was only part of the brief. The layout also needed to balance shared working with quieter rooms, meetings and informal conversations. The completed headquarters combines open-plan spaces with private offices, meeting rooms and breakout areas. Internal glazing allows views between spaces, while the first-floor walkway overlooks the circulation areas below. These connections give the building a sense of openness without requiring every activity to happen in the same room.

 

Reception interior with a black steel staircase, glass balustrades, timber wall linings, circular pendant lights and exposed ceiling services.
The reception brings timber, glass and dark metalwork together, with the staircase and circular lighting giving the arrival space a distinctive character.

 

First-floor walkway with a glass balustrade overlooking the stair void, beneath a vaulted ceiling with pendant lights and timber wall linings.
The first-floor walkway keeps the levels visually connected, with glass balustrades and a vaulted ceiling maintaining a sense of openness around the stair.

 

A fresh outlook

Natural light and views were central to the workplace design. Rooflights brighten the interiors, while large windows frame the courtyard, planted roof and countryside beyond.

The materials help give those spaces warmth and character. Slatted timber sits alongside dark metalwork and white vaulted ceilings, with polished concrete floors linking the shared areas. Exposed services form part of the architecture rather than disappearing behind a suspended ceiling.

There is even a sheep sculpture on the planted roof, which makes a change from the usual office pot plant.

 

Glazed first-floor walkway overlooking a planted roof with a sheep sculpture, with timber shading outside and trees beyond the offices.
Glazing opens the walkway to views of planting and trees, bringing the landscape into the journey between rooms and workspaces.

 

Sheep sculpture standing among sedum planting outside a glazed walkway, with a glass balustrade in the foreground and trees beyond.
The planted roof gives the walkway a greener outlook, with a sheep sculpture adding an individual touch to the view between the office wings.

 

Thinking beyond opening day

The building’s environmental approach brings together solar PV, heat recovery ventilation, high-level opening windows and external shading. Herefordshire stone and locally supplied concrete connect the project with nearby resources, while timber and zinc give the familiar gabled forms a contemporary identity.

The two completed wings are also designed to accommodate a third in the future. Alongside the adaptable internal spaces, this gives the organisation options as its requirements change.

 

Sunlit stone-and-zinc office wing near Ludlow, with full-height glazing, timber louvres and planting beside the entrance path.
Sunlight picks out the contrast between rough stone, warm timber and dark zinc, with planting softening the approach to the offices.

 

Angled view of the standing-seam zinc roof and dark gable surround, with timber shading and glazing below at the Ludlow offices.
Zinc wraps the roof and gable edges, giving the traditional pitched form a precise outline against the softer texture of timber and stone.

 

Completed in 2025, the headquarters answers a brief that began with the everyday experience of coming to work. Its interest lies in how the larger architectural decisions and smaller details support that ambition, from the sheltered courtyard to a view through several spaces at once.

Explore the building, materials and environmental approach on our Ludlow Commercial Headquarters project page.

 

Oblique view of the linked gabled wings at Ludlow Commercial Headquarters, with large windows, timber shading and a lawn in front.
Large glazed openings and the connecting section give the headquarters an open character, while the separate gables break down the building’s scale.

 

This project is part of our #40Projects40Weeks series, celebrating 40 years of RRA Architects and the people, places and ideas that have shaped our work. Follow the series on our News page.

About RRA Architects

Established in 1986, RRA Architects works across all sectors and provides architectural services from initial feasibility and masterplanning through to completion. We work nationally, with projects primarily across Gloucestershire, Herefordshire, Shropshire, Worcestershire, the Cotswolds, Bristol and Avon, the West Midlands, South West and South Wales.

Search articles

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors

Newsletter

September & October 2026 Newsletter

July & August 2026 Newsletter

May & June 2026 Newsletter

March & April 2026 Newsletter

January & February 2026 Newsletter

November & December 2025 Newsletter

September & October 2025 Newsletter

July & August 2025 Newsletter

June & July 2025 Newsletter

April & May 2025 Newsletter

February & March 2025 Newsletter

December 2024 Newsletter

November & December 2024 Newsletter

September & October 2024 Newsletter

July & August 2024 Newsletter

May & June 2024 Newsletter

March & April 2024 Newsletter

January & February 2024 Newsletter

December 2023 Newsletter

November 2023 Newsletter

October 2023 Newsletter

September 2023 Newsletter

August 2023 Newsletter

July 2023 Newsletter

June 2023 Newsletter

May 2023 Newsletter

April 2023 Newsletter

March 2023 Newsletter

February 2023 Newsletter

January 2023 Newsletter

December 2022 Newsletter

November 2022 Newsletter

October 2022 Newsletter

September 2022 Newsletter

August 2022 Newsletter

July 2022 Newsletter

June 2022 Newsletter

May 2022 Newsletter

April 2022 Newsletter

March 2022 Newsletter

February 2022 Newsletter

January 2022 Newsletter

December 2021 Newsletter

November 2021 Newsletter

October 2021 Newsletter

September 2021 Newsletter

August 2021 Newsletter

July 2021 Newsletter

June 2021 Newsletter

May 2021 Newsletter

April 2021 Newsletter

March 2021 Newsletter

February 2021 Newsletter

January 2021 Newsletter

December Newsletter 2020

November Newsletter 2020

October Newsletter 2020

September Newsletter 2020

August Newsletter 2020

July Newsletter 2020

June Newsletter 2020

May Newsletter 2020

April Newsletter 2020

March Newsletter 2020

February Newsletter 2020

January Newsletter 2020

December Newsletter 2019

November Newsletter 2019

October Newsletter 2019

September Newsletter 2019

August Newsletter 2019

July Newsletter 2019

June Newsletter 2019

May Newsletter 2019

April Newsletter 2019

March Newsletter 2019

February Newsletter 2019

January Newsletter 2019

December Newsletter 2018

November Newsletter 2018

October Newsletter 2018

September Newsletter 2018