Ludlow Commercial Headquarters

  • Completed in 2025, this new headquarters near Ludlow brings a previously separated team together in a purpose-designed workplace. RRA’s sustainable office design combines light-filled interiors, connected working spaces and a sheltered courtyard with locally quarried Shropshire stone, timber and zinc. The completed two-wing building also allows for a third wing to be added in the future.
  • Completed Date: Completed 2025
  • Location: Near Ludlow, Shropshire
  • Contractor: EG Carters
  • Photo Credit: RRA Architects and Infinity Unlimited
  • Categories: Commercial, Industrial & Agricultural
  • Tags: Commercial Architecture, Ludlow, Office Design, Shropshire Architects, Sustainable Design, Workplace Design
  • Two gabled office wings with dark zinc roofs, timber louvres and stone walls, joined by a glazed link around a courtyard near Ludlow.
  • View through trees and shrubs towards the courtyard of Ludlow Commercial Headquarters, showing glazed walls, zinc roofs and timber shading.
  • Oblique view of the linked gabled wings at Ludlow Commercial Headquarters, with large windows, timber shading and a lawn in front.
  • Stone side elevation of the offices near Ludlow, with tall windows, a zinc roof, rooflights and a timber-lined glazed gable.
  • Sunlit stone-and-zinc office wing near Ludlow, with full-height glazing, timber louvres and planting beside the entrance path.
  • Angled view of the standing-seam zinc roof and dark gable surround, with timber shading and glazing below at the Ludlow offices.
  • Illustrated ground-floor plan showing reception, a central staircase, offices, meeting rooms and breakout space in two wings around a landscaped courtyard.
  • Illustrated first-floor plan showing private and shared offices linked by a central landing, with stair voids, a tea point and a planted roof between the wings.
  • Reception interior with a black steel staircase, glass balustrades, timber wall linings, circular pendant lights and exposed ceiling services.
  • First-floor walkway with a glass balustrade overlooking the stair void, beneath a vaulted ceiling with pendant lights and timber wall linings.
  • Glazed first-floor walkway overlooking a planted roof with a sheep sculpture, with timber shading outside and trees beyond the offices.
  • Sheep sculpture standing among sedum planting outside a glazed walkway, with a glass balustrade in the foreground and trees beyond.
  • Upward view of three rooflights in a white vaulted ceiling, with suspended cylindrical pendant lights and a slatted timber wall to one side.

The client wanted to bring staff together in offices that offered greater comfort, flexibility and opportunities for collaboration. Their existing accommodation occupied older agricultural buildings, with separate rooms limiting interaction between the teams.

RRA was initially appointed to investigate converting a warehouse within the main complex. The feasibility study identified significant constraints: its height limited the potential floor arrangements, adaptation costs were substantial and incorporating the desired environmental measures would be challenging.

A new building elsewhere on the site offered a more appropriate way to meet the brief, while the warehouse remained in use for other business operations.

A contemporary response to its setting

The building’s gabled wings and courtyard arrangement draw on forms found in the surrounding rural architecture. Dividing the accommodation between connected wings gives the headquarters a more varied scale, with glazing opening views through the building and towards the landscape.

Shropshire stone anchors the elevations within their setting, while timber adds warmth around the glazed gables. Zinc extends across roofs and façades, defining the forms and providing crisp junctions between materials.

The courtyard creates a sheltered outdoor space at the centre of the composition, with planting helping connect the offices to their surroundings.

Spaces that feel connected

The interior combines open-plan working with private offices, meeting rooms and informal places to pause or talk. Internal glazed partitions maintain visual connections between these different spaces, while the first-floor walkway overlooks the double-height circulation areas below.

Rooflights and generous windows bring natural light into the building. White vaulted ceilings contrast with dark metalwork, exposed services and slatted timber linings, while polished concrete floors give the shared spaces a consistent material character.

Views towards the courtyard, planted roof and countryside make the landscape part of the everyday experience of moving through the offices.

Sustainable office design with flexibility in mind

Environmental measures are integrated into the building’s form and fabric. External brise-soleil helps control solar gain while maintaining daylight, and high-level opening windows allow natural purge ventilation. Mechanical ventilation with heat recovery provides controlled fresh air while recovering heat from extracted air, complemented by a solar PV array generating renewable electricity.

The use of locally quarried stone and locally supplied concrete also reflects the client’s intention to draw on nearby material resources.

Adaptable internal spaces allow the workplace to evolve, while provision for a third wing gives the organisation an option for future expansion. The result is a headquarters designed around its current needs, with the capacity to accommodate change.

This project featured as Week 33 of our #40Projects40Weeks celebrating the 40th Anniversary of RRA Architects and showcasing some of the projects that have shaped the business over the years. Read more about this project at Week 33: Designing A Better Place To Work.

Project Highlights

  • Two linked gabled wings arranged around a sheltered courtyard
  • Open-plan workspaces, private offices, meeting rooms and informal breakout areas
  • Internal glazing and double-height spaces connecting floors and workspaces
  • Shropshire stone and locally supplied concrete alongside timber and zinc
  • Solar PV, heat recovery ventilation, high-level opening windows and external solar shading
  • Planted roof areas and provision for a future third wing