Project Tag: <span>Conservation / Heritage</span>

RRA Architects > Conservation / Heritage

Ford Abbey – Boutique Hotel

May 24, 2018 / By admin

The basic fundamental design approach has been the careful conservation repair of important heritage and the combination of all the service and fit-out demands of a 5 star hotel. We developed with the client body a hotel format and room strategy that allowed development of the brand and negotiation within existing structure. Wherever possible, the [...]

Gwynne Warehouse

May 24, 2018 / By admin

RRA developed this project to combine all the demands of a contemporary exhibition space, whilst allowing for the fact that, the building was grade 2 listed and flooded at least twice a year. The structure was in a partially derelict state and required extensive timber repair work and rebuild. The design strategy ensured the use [...]

The Buttermarket – RIBA Competition Award

May 24, 2018 / By admin

RRA's Buttermarket entry was designed to establish an over-arching brand identity which would work with existing market-traders, and purveyors of local Herefordshire food heritage, to manage, promote and incubate new visitors and foot fall within this historic Victorian food hall. RRA, in collaboration with the UK’s leading independant markets agent Quarterbridge, developed an exciting proposal [...]

The Watershed

May 24, 2018 / By admin

Many of the original building materials have been re-used, which would otherwise have become rubble. The aim of the construction, to minimise pollution through use of appropriate material selection, sourcing materials locally and ensuring reliance on traditional building construction using lime. The ground floor is raked to allow the flood water to be easily drained [...]

Grand Designs – Hillcot Barn

May 24, 2018 / By admin

The design celebrates stone structure, shelter and daylight, using the high vantage point to great effect. RRA’s conservation skills were used to great effect, to facilitate stone repair, using Cintec Anchors to shore up cracked walls and of lime repointing within the historic structure. To meet the client’s budget constraint off site manufacture was adopted, [...]